Abstract :
This paper gives an example of the considerations and strategy adopted to carry out an intrusive modification on a nuclear power station. It discusses the electrical overlay system recently installed at the 960 MW Wylfa nuclear power plant, the last of the Magnox series of gas cooled reactors