DocumentCode :
1583058
Title :
Program selection of construction project based on green building theory
Author :
Mo, Liu ; Bin, Zhang ; Lin, Wang
Author_Institution :
Traffic and construction engineering college, BeiHua University, Jilin, China
fYear :
2012
Firstpage :
1
Lastpage :
4
Abstract :
As society advances, green building has become a fundamental issue in today´s engineering practice. It is the key to implement green evaluation of the project program during the early life-cycle management. This paper establishes a decision-making model of project selection based on improved analytic hierarchy (IAHP) and on ordinal interval numbers sort of ideal point program,and applies the model to a primary highway construction program. Case analysis shows it is a simple fast evaluation method, and it suits for the initial optimization of the project when information is lack during the planning period.
Keywords :
IAHP; TOPSIS; green building; ordinal interval number; project selection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
World Automation Congress (WAC), 2012
Conference_Location :
Puerto Vallarta, Mexico
ISSN :
2154-4824
Print_ISBN :
978-1-4673-4497-5
Type :
conf
Filename :
6321393
Link To Document :
بازگشت