Title :
Comprehensive SC renewal planning scheme considering optimal allocation and reallocation
Author :
Kimura, Katsuyuki ; Tanaka, Yuta ; Iwamoto, Shinichi
Author_Institution :
Tohoku-Electr. Power Co., Inc., Japan
Abstract :
With the high economic growth period in Japan, the power demand has been increasing sharply year by year. Therefore, the Japanese utilities have installed shunt capacitors along with the predicted demand. Meanwhile, some SCs have been aged because they have been used for a long time. Therefore, they have to be replaced sometime soon. It is important to renew the aged SCs efficiently and economically. In this paper, we propose a new total SC renewal planning scheme using the voltage stability index L-index. This paper proposes an improved particle swarm optimization (PSO) method. Since a search by PSO is considerably dependent on pbest and gbest, there is a possibility of settling in a local optimal solution. Therefore, dispersed hybrid PSO (DHPSO) is proposed to mitigate this drawback. We also proposed the optimal SC removal order scheme. Finally, we run simulations for the IEEJ 30 machine 115 bus system to confirm the validity of the proposed method.
Keywords :
particle swarm optimisation; power capacitors; power system planning; 115 bus system; IEEJ 30 machine; Japanese utilities; L-index; economic growth period; optimal allocation; optimal reallocation; particle swarm optimization; power demand; shunt capacitor renewal planning; voltage stability index; Aging; Capacitors; Distributed power generation; Economic forecasting; Hybrid power systems; Particle swarm optimization; Power demand; Power generation economics; Stability; Voltage; Dispersed Hybrid Particle Swarm Optimization; L-index; N-1 contingency; Optimal Allocation; Shunt Capacitor; Voltage Stability;
Conference_Titel :
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location :
Calgary, AB
Print_ISBN :
978-1-4244-4241-6
DOI :
10.1109/PES.2009.5275521