Accelerated delivery of Managed Motorways: Birmingham box phase 1
Author
Bennett, Tex ; Dhanda, H. ; Goddard, J. ; Lord, Graydon
Author_Institution
Mouchel Group PLC, England
fYear
2010
Firstpage
1
Lastpage
6
Abstract
The Birmingham Box Managed Motorways Phases 1 & 2 (BB MM 1&2) project is deploying Managed Motorways (MM) technology and operational regimes onto the M40, M42 and M6 in England. Phase 1 was completed in November 2009 and Phase 2 is currently being constructed. The Project Team achieved successful delivery of Phase 1 within the constraints of an accelerated programme, going from the commencement of detailed design, tender through construction and into operation in approximately two years. This paper examines some of the techniques used to plan, manage and deliver the rapid deployment of a complex, operationally led technology scheme, focussing on Phase 1 of the project.
Keywords
Managed Motorways; Rapid Deployment;
fLanguage
English
Publisher
iet
Conference_Titel
Road Transport Information and Control Conference and the ITS United Kingdom Members' Conference (RTIC 2010) - Better transport through technology, IET
Conference_Location
London, UK
Type
conf
DOI
10.1049/cp.2010.0365
Filename
5549193
Link To Document