DocumentCode
1584213
Title
Applying Ant Colony Optimization for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem
Author
Benbouzid-Sitayeb, Fatima ; Ammi, Ismail ; Varnier, Christophe ; Zerhouni, Noureddine
Author_Institution
Lab. des Methodes de Conception de Syst. (LMCS), Nat. Inst. of Comput. Sci. (INI), Algiers
fYear
2008
Firstpage
1
Lastpage
6
Abstract
In this paper a sequential resolution of the joint production and preventive maintenance scheduling problem in permutation flowshops is considered with the objective of minimizing the makespan. The proposed sequential algorithm, called SAS, consists of two steps: first the scheduling of the production jobs with Ant System algorithm (AS) by Dorigo and al. (1996) is considered. Then the insertion of the maintenance tasks is done according to several heuristics developed in previous works, taking the production scheduling as a strong constraint. Computational experiments are conducted on a large set of instances and the resulting joint ACO is presented.
Keywords
flow production systems; flow shop scheduling; optimisation; preventive maintenance; ant colony optimization; ant system algorithm; flowshop sequencing problem; joint production scheduling; permutation flowshops; preventive maintenance scheduling problem; sequential resolution; Ant colony optimization; Computer science; Delay effects; Job production systems; Job shop scheduling; Machinery production industries; Preventive maintenance; Processor scheduling; Scheduling algorithm; Synthetic aperture sonar; ACO; Flowshop; Joint scheduling; Preventive maintenance; Production; Sequential approach;
fLanguage
English
Publisher
ieee
Conference_Titel
Information and Communication Technologies: From Theory to Applications, 2008. ICTTA 2008. 3rd International Conference on
Conference_Location
Damascus
Print_ISBN
978-1-4244-1751-3
Electronic_ISBN
978-1-4244-1752-0
Type
conf
DOI
10.1109/ICTTA.2008.4530343
Filename
4530343
Link To Document