Simulators are the Key for Large-Scale Instrumentation and Control System Refurbishment Projects
Author
Janosy, Janos Sebestyen
Author_Institution
Head of Simulator Dev. Dept., MTA KFKI Atomic Energy Res. Inst., Budapest
fYear
2008
Abstract
With proper operation and waste management the nuclear fission power is one of the clearest and cheapest energy sources: no gases are emitted during the energy generation and other related preparatory etc. processes. The upcoming nuclear-fusion-based power plants are even more promising; all contamination in these plants will be decayed practically to nil in less than 100 years. Renewable energy sources can play an important, but only a supplementary role, at least for the foreseeable future. In the paper the author summarize the results and practice we used at Paks NPP in Hungary, first in the evaluation of safety studies, then in the working-out of new state-of-art operational procedures, and finally, during reconstruction of the reactor safety system and other I&C Systems, the replacement of which - thanks to the extensive testing and tuning performed using the full-scope replica simulator - was completed during the regular re-fuelling outage of the NPP units.
Keywords
fission reactor safety; fusion reactors; nuclear power stations; power system control; waste management; Paks NPP; control system refurbishment projects; large-scale instrumentation; nuclear fission power; nuclear-fusion-based power plants; reactor safety system; replica simulator; waste management; Contamination; Control system synthesis; Fission reactors; Gases; Instruments; Large-scale systems; Nuclear power generation; Power generation; Safety; Waste management;
fLanguage
English
Publisher
ieee
Conference_Titel
Modeling & Simulation, 2008. AICMS 08. Second Asia International Conference on
Conference_Location
Kuala Lumpur
Print_ISBN
978-0-7695-3136-6
Electronic_ISBN
978-0-7695-3136-6
Type
conf
DOI
10.1109/AMS.2008.189
Filename
4530439
Link To Document