DocumentCode
1586800
Title
Reliability unit commitment in the new ERCOT nodal electricity market
Author
Hui, Hailong ; Yu, Chien-Ning ; Moorty, Sainath
Author_Institution
ERCOT Inc., Taylor, TX, USA
fYear
2009
Firstpage
1
Lastpage
8
Abstract
ERCOT is transitioning from a current zonal market to a newly redesigned nodal market. In the new ERCOT nodal wholesale market, a Reliability Unit Commitment (RUC) process is designed and implemented to ensure transmission system reliability and security. The main objective of RUC is to ensure that enough resource capacity, in addition to ancillary service capacity, is committed in the right locations to reliably serve the forecasted load in the ERCOT system. The RUC is implemented in a Security Constrained Unit Commitment (SCUC) framework that minimizes the total operation costs based on generator three-part supply offers subject to various system and resource security constraints. Some enhanced features have been implemented in the RUC SCUC engine to handle special resource scheduling such as combined cycle resources, split generation resources and self-committed resources. The RUC settlement uses a ldquomake-wholerdquo payment to ensure all generating resources committed by RUC are adequately compensated for their operation costs.
Keywords
costing; power markets; power system economics; power system reliability; ERCOT; RUC SCUC engine; nodal electricity market; operation costs; reliability unit commitment; split generation; Character generation; Costs; Economic forecasting; Electricity supply industry; Engines; Load forecasting; Power system reliability; Power systems; Process design; Security; Electric Power Systems; Nodal Market; Reliability; Unit Commitment;
fLanguage
English
Publisher
ieee
Conference_Titel
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location
Calgary, AB
ISSN
1944-9925
Print_ISBN
978-1-4244-4241-6
Type
conf
DOI
10.1109/PES.2009.5275633
Filename
5275633
Link To Document