• DocumentCode
    1587057
  • Title

    Economic analysis of the recovery fresh air heat pump units in the cold and serious cold regions

  • Author

    Chen Aoxue ; Ran Chunyu ; Liu Hailong

  • Author_Institution
    School of Municipal & Environmental Engineering, Jilin Institute of Architectural and Civil Engineer, Changchun, China
  • fYear
    2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    In order to solve the air-source heat pump does not run and the new issue of wind frost crack unit in the cold and serious cold regions. An air condition experimental system is studied, with the recycled exhaust heat to heat fresh air. The system saving the standard coal consumption, electricity saving and pollutant emissions were calculated through the experiment. Combined with an engineering example, compared the original design scheme to the new design scheme, the new design scheme can save standard coal consumption about 33.74 tons, operating cost saves about 2.3 million yuan, operation power less than the original scheme, it saves 1.82 million kWh and electricity 0.96 million yuan, the energy saving rate is about 18%.It reduces the pollutant emissions and saves the administrative costs. Using the new design scheme, system recovery period is 1.07 years.
  • Keywords
    energy conservation; environmental protection; recovery period; the cold and severe cold regions; the recovery fresh air heat pump units;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    World Automation Congress (WAC), 2012
  • Conference_Location
    Puerto Vallarta, Mexico
  • ISSN
    2154-4824
  • Print_ISBN
    978-1-4673-4497-5
  • Type

    conf

  • Filename
    6321551