Abstract :
It is useful to start a GIS project with a brief description of the planning and the engineering process. Typically, the process starts with the network planning performed by the system engineers. It is therefore important that the system planning engineers possess a certain minimum knowledge of GIS to be able to utilize the benefits of this technology.
Keywords :
gas insulated substations; gas insulated switchgear; planning; GIS substations; gas insulated substation; gas insulated switchgear; network planning; Documentation; Geographic Information Systems; Manufacturing; Power Switchgear - c37; Power system protection; Process planning; Substations; Switches; Systems engineering and theory; Transformers;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN :
0-7803-9157-8
Type :
conf
DOI :
10.1109/PES.2005.1489767
Filename :
1489767
Link To Document :
بازگشت