Title :
Value based transmission planning process for joint coordinated system plan
Author :
Hecker, L. ; Zhou, Z. ; Osborn, D. ; Lawhorn, J.
Author_Institution :
Midwest ISO, St. Paul, MN, USA
Abstract :
This paper describes the multi-step value based transmission planning process for joint coordinated system plan with the consideration of large scale wind generation over the Eastern Interconnect footprint. As the result of the coordination of multiple RTOs, the conceptual transmission expansion plans are developed to meet both reliability and economic needs. A combined EHV AC and HVDC transmission line architecture is used for the value based planning. The initial economic analysis results are provided in this paper including LMP changes, benefit/cost ratios, interface flow energy changes.
Keywords :
HVDC power transmission; power transmission economics; power transmission planning; power transmission reliability; wind power; EHV AC transmission line; Eastern Interconnect footprint; HVDC transmission line; LMP changes; economic analysis; joint coordinated system plan; large scale wind generation; reliability; value based transmission planning; Economic forecasting; ISO; Meeting planning; Portfolios; Power generation economics; Power markets; Power system economics; Process planning; Wind energy generation; Wind forecasting; Conceptual Transmission Overlay; EHV; Economic Transmission Planning; Joint Coordinated System Plan (JCSP); Wind;
Conference_Titel :
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location :
Calgary, AB
Print_ISBN :
978-1-4244-4241-6
DOI :
10.1109/PES.2009.5275807