• DocumentCode
    1596313
  • Title

    Radio communications in the Channel Tunnel

  • Author

    Franklin, M.A.

  • fYear
    1993
  • Firstpage
    120
  • Lastpage
    124
  • Abstract
    The Channel Tunnel railway project requires five radio systems to assist its operation. These systems have to operate in a unique environment, and operate in a mix of tunnel and terminal sites. Their design must be compatible with the architecture of the new construction project, both in terms of the fixed infrastructure and of the railway rolling stock requirements. The five radio systems used are, the Track to Train system, the Concession system, the On Train Crew system, the On Train VHF system and the UK Terminal Paging system. The author discusses the functionality required for each of the radio systems, then outlines the engineering solution for each system in terms of the architecture, operation, and design considerations
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Mobile and Personal Communications, 1993., Seventh IEE European Conference on
  • Conference_Location
    Brighton
  • Print_ISBN
    0-85296-607-5
  • Type

    conf

  • Filename
    269672