Abstract
Based on the analysis of shipbuilding plan points, and work quantity, working time parameters extraction method, put forward the DELMIA for tool to ship construction plan of simulation system constructing method, in order to DPE definition manufacturing process and resources needed, and with DELMIA QUEST for real shipyard in physical space of simulation modeling, will study hours, work amount parameter form manufacturing plan and import shipyard in physical space simulation model, the visual simulation of operation, the analysis to ship construction plan and occupancy resources, the venue and the rationality of the required time. Thus can improve shipyard venue, equipment utilization effective scheme, form a reasonable shipyard to ship construction plan.
Keywords
data visualisation; discrete event simulation; production engineering computing; shipbuilding industry; DELMIA QUEST; DPE definition manufacturing process; equipment utilization effective scheme; occupancy resources; operation visual simulation; physical space simulation model; ship construction plan analysis; ship construction program; shipbuilding plan point analysis; shipyard venue improvement; simulation system constructing method; visual simulation; work quantity; working time parameters extraction method; Assembly; Buildings; Cranes; Marine vehicles; Solid modeling; Welding; DELMIA; ship construction program; visualization;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent System Design and Engineering Application (ISDEA), 2012 Second International Conference on
Conference_Location
Sanya, Hainan
Print_ISBN
978-1-4577-2120-5
Type
conf
DOI
10.1109/ISdea.2012.517
Filename
6173355
Link To Document