DocumentCode
1597946
Title
Wind power forecasting and error analysis using the autoregressive moving average modeling
Author
Rajagopalan, S. ; Santoso, S.
Author_Institution
Dept. of Electr. & Comput. Eng., Univ. of Texas at Austin, Austin, TX, USA
fYear
2009
Firstpage
1
Lastpage
6
Abstract
This paper presents a method for wind power forecasting and studies the relationship between the accuracy of the forecast and wind power variability. Actual wind power measurement data is applied to model an auto regressive moving average (ARMA) process. Burg and Shanks algorithms are then utilized to determine the model coefficients. Variability, accuracy and measured error in forecasts generated by the model are used to asses the data and the quality of the forecast. The model is shown to have good accuracy in forecasts within one hour and declines in accuracy further ahead in time. Drawing comparisons between forecasts generated for cases of differing data variability, the aggregate power generation of a group of wind farms is shown to have better accuracy in forecasts than the single wind farm.
Keywords
autoregressive moving average processes; error analysis; load forecasting; power measurement; wind power plants; ARMA; Shanks algorithm; autoregressive moving average modeling; error analysis; wind farm; wind power forecasting; wind power measurement data; wind power variability; Aggregates; Autoregressive processes; Error analysis; Power generation; Power measurement; Predictive models; Wind energy; Wind energy generation; Wind farms; Wind forecasting; Autoregressive moving average processes; Forecasting; Lattice filters; Least mean square methods; Signal processing; Statistics; Wind power generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power & Energy Society General Meeting, 2009. PES '09. IEEE
Conference_Location
Calgary, AB
ISSN
1944-9925
Print_ISBN
978-1-4244-4241-6
Type
conf
DOI
10.1109/PES.2009.5276019
Filename
5276019
Link To Document