DocumentCode
1598118
Title
A Method for Multi-project with Resource Constraints Based on Greedy Strategy
Author
Liu, Haibin ; Wang, Yanbing
Author_Institution
China Aerosp. Eng. Consultation Center, Beijing
fYear
2009
Firstpage
22
Lastpage
27
Abstract
Resource conflict is an outstanding problem in concurrent multiple projects with sharing a common and limited resource pool, and it often results in lower performance of these projects. Therefore, it is important and urgent to find an effective method for scheduling multiple projects with limited resources. A mathematical model for the multi-project scheduling problem with resource-constrained is proposed, and a scheduling algorithm based on greedy strategy for the problem is analyzed. Its application in real projects and comparison with other scheduling schemes proves that the algorithm is feasible.
Keywords
greedy algorithms; project management; resource allocation; scheduling; greedy strategy; mathematical model; multiple project scheduling; resource conflict; resource constraint; Aerospace engineering; Algorithm design and analysis; Genetic algorithms; Heuristic algorithms; Iterative algorithms; Job shop scheduling; Mathematical model; Resource management; Sampling methods; Scheduling algorithm; greedy strategy; multi-projects scheduling; resource allocation; resource constraints;
fLanguage
English
Publisher
ieee
Conference_Titel
Autonomic and Autonomous Systems, 2009. ICAS '09. Fifth International Conference on
Conference_Location
Valencia
Print_ISBN
978-1-4244-3684-2
Electronic_ISBN
978-0-7695-3584-5
Type
conf
DOI
10.1109/ICAS.2009.9
Filename
4976575
Link To Document