Title :
Catering for electromagnetic compatibility requirements in the project plans of products
Author_Institution :
Div. of Eng., Alcatel Altech Telecoms, Boksburg, South Africa
fDate :
6/21/1905 12:00:00 AM
Abstract :
This paper addresses the main issues that one needs to take into account when drafting project plans for new products, where EMC requirements have to be incorporated. It is also shown why these guidelines must be implemented as early in the product development cycle as possible. Some practical problems with introducing EMC requirements during the final project stages are also be given
Keywords :
electromagnetic compatibility; planning; product development; project engineering; EMC requirements; electromagnetic compatibility; new products; practical problems; product development cycle; project plans; Cost function; Crystals; Electromagnetic compatibility; Frequency; Gaskets; Guidelines; Microprocessors; Product development; Production; Time measurement;
Conference_Titel :
Africon, 1999 IEEE
Conference_Location :
Cape Town
Print_ISBN :
0-7803-5546-6
DOI :
10.1109/AFRCON.1999.821935