DocumentCode :
1598781
Title :
Catering for electromagnetic compatibility requirements in the project plans of products
Author :
Venter, F.A.
Author_Institution :
Div. of Eng., Alcatel Altech Telecoms, Boksburg, South Africa
Volume :
2
fYear :
1999
fDate :
6/21/1905 12:00:00 AM
Firstpage :
1131
Abstract :
This paper addresses the main issues that one needs to take into account when drafting project plans for new products, where EMC requirements have to be incorporated. It is also shown why these guidelines must be implemented as early in the product development cycle as possible. Some practical problems with introducing EMC requirements during the final project stages are also be given
Keywords :
electromagnetic compatibility; planning; product development; project engineering; EMC requirements; electromagnetic compatibility; new products; practical problems; product development cycle; project plans; Cost function; Crystals; Electromagnetic compatibility; Frequency; Gaskets; Guidelines; Microprocessors; Product development; Production; Time measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Africon, 1999 IEEE
Conference_Location :
Cape Town
Print_ISBN :
0-7803-5546-6
Type :
conf
DOI :
10.1109/AFRCON.1999.821935
Filename :
821935
Link To Document :
بازگشت