DocumentCode
1600445
Title
EMI/EMC, lightning, and ESD verification approach for the Falcon 9 launch vehicle: Part II
Author
Elkman, W. ; Trinh, J. ; McCaughey, P. ; Chen, W.
Author_Institution
Space Exploration Technol., Hawthorne, CA, USA
fYear
2011
Firstpage
295
Lastpage
299
Abstract
Trends in the Industry standard approach to the design and verification of systems for EMI/EMC compliance have become more focused on implementing broad scale unit-to system-level verification using specific test requirements from MIL-STD-461. This paper, Part II, describes the Space Exploration Technologies analysis and test verification methods used to achieve Falcon 9 launch vehicle self-compatibility and compatibility with the Eastern Launch Range RF requirements and interface compatibility with user payloads, including the COTS Dragon spacecraft. The detailed design analysis methods used to predict design performance are described, as well as the detailed tailored test methods used to verify functional performance and margins to the Eastern Launch Range RF emissions and susceptibility requirements.
Keywords
aerospace testing; conformance testing; electromagnetic interference; electrostatic discharge; lightning; space vehicles; COTS Dragon spacecraft; EMI/EMC compliance; ESD verification; Falcon 9 launch vehicle; MIL-STD-461; eastern launch range RF requirements; industry standard approach; interface compatibility; lightning; self-compatibility; space exploration technologies; specific test requirements; test verification; Aerospace electronics; Electromagnetic compatibility; Electromagnetic interference; Lightning; Space vehicles; Spaceborne radar;
fLanguage
English
Publisher
ieee
Conference_Titel
Electromagnetic Compatibility (EMC), 2011 IEEE International Symposium on
Conference_Location
Long Beach, CA, USA
ISSN
2158-110X
Print_ISBN
978-1-4577-0812-1
Type
conf
DOI
10.1109/ISEMC.2011.6038325
Filename
6038325
Link To Document