DocumentCode
1605865
Title
Customizing the development of long-range load projections for electrical utility planning studies
Author
Hager, Gerald E. ; McDonald, Bob
Author_Institution
Electr. Syst. Consultants Inc., Fort Collins, CO, USA
fYear
2003
Abstract
Load growth, or the lack thereof, has a profound affect on proper electrical system planning. Some utilities grow in a fairly uniform, predictable fashion but most have a combination of areas with low or negative growth potential, areas where unpredictable large spot loads could occur, and areas evolving from rural to suburban with the characteristic "S" curve growth profile. Proper long-range planning requires different approaches for each type of load growth to achieve an economical and proper system design.
Keywords
electricity supply industry; load (electric); load forecasting; power system planning; S curve growth profile; economical system design; electrical system planning; electrical utility planning; load growth; long-range load projections; low growth potential; negative growth potential; unpredictable large spot loads; Economic forecasting; Floods; IEEE members; Information resources; Land use planning; Power generation economics; Power system planning; Timing; Wildlife;
fLanguage
English
Publisher
ieee
Conference_Titel
Rural Electric Power Conference, 2003
Print_ISBN
0-7803-7905-5
Type
conf
DOI
10.1109/REPCON.2003.1209580
Filename
1209580
Link To Document