Title : 
Fast tracking a 30.6 MW supersynchronous LCI compressor drive on a large gas transmission pipeline
         
        
            Author : 
Leuw, Jack ; Lockley, Bill
         
        
            Author_Institution : 
TransCanada PipeLines Ltd., Calgary, Alta., Canada
         
        
        
        
        
            Abstract : 
This paper describes the processes used in justifying, purchasing, installing and starting up a large line-commutated invertor (LCI)-fed supersynchronous drive on a pipeline application, with a total time from conception to start up of less than 18 months
         
        
            Keywords : 
DC-AC power convertors; commutation; compressors; invertors; natural gas technology; project engineering; synchronous motor drives; 30.6 MW; Canada; application; compressor drive; fast-track projects; line-commutated invertor; natural gas transmission pipeline; supersynchronous motor drive; Costs; Environmental economics; Interconnected systems; Lifting equipment; Natural gas; Pipelines; Power generation economics; Throughput; Transportation; Turbines;
         
        
        
        
            Conference_Titel : 
Petroleum and Chemical Industry Conference, 1997. Record of Conference Papers. The Institute of Electrical and Electronics Engineers Incorporated Industry Applications Society 44th Annual
         
        
            Conference_Location : 
Banff, Alta.
         
        
        
            Print_ISBN : 
0-7803-4217-8
         
        
        
            DOI : 
10.1109/PCICON.1997.648181