DocumentCode
1612875
Title
Notice of Retraction
Management and control of geotechnical engineering construction project
Author
Qingchao, Yang ; Tienan, Wang ; Zhe, Hao
Author_Institution
College of geotechnical engineering Shenyang, University, Shenyang City, China
fYear
2011
Firstpage
1
Lastpage
3
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Based on the geotechnical characteristics of the project and the basic elements of project management, this page created some problems, discussed the management measures of geotechnical engineering comprehensively, pointed out the bodies, environment, schedule, quality, safety, cost and other geotechnical construction project are the critical control factors to determine implementation of geotechnical construction projects successfully. Finally, it proposed several measures to solve the problems.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Based on the geotechnical characteristics of the project and the basic elements of project management, this page created some problems, discussed the management measures of geotechnical engineering comprehensively, pointed out the bodies, environment, schedule, quality, safety, cost and other geotechnical construction project are the critical control factors to determine implementation of geotechnical construction projects successfully. Finally, it proposed several measures to solve the problems.
Keywords
Process control; Production; Project management; Quality control; Safety; Schedules; Standards organizations; Control; Engineering; Geotechnical; Management; Project Management;
fLanguage
English
Publisher
ieee
Conference_Titel
E -Business and E -Government (ICEE), 2011 International Conference on
Conference_Location
Shanghai, China
Print_ISBN
978-1-4244-8691-5
Type
conf
DOI
10.1109/ICEBEG.2011.5877026
Filename
5877026
Link To Document