• DocumentCode
    1612906
  • Title

    Engineering Challenges for ITER

  • Author

    Nelson, B.E.

  • Author_Institution
    Oak Ridge Nat. Lab., Oak Ridge
  • fYear
    2007
  • Firstpage
    133
  • Lastpage
    133
  • Abstract
    Summary form only given. The United States has joined with China, the European Union, India, Japan, the Republic of Korea, and the Russian Federation in an international collaboration to construct and operate ITER, a full-scale, 400 MW experimental fusion device. ITER will be constructed at Cadarache, France, and is expected to be completed by 2016. U.S. Contributions to ITER (U.S. ITER) is a Department of Energy Office of Science project consisting of procurement of hardware (including supporting R&D and design), assignment of personnel (U.S. engineers and scientists) to the ITER site in Cadarache, and cash contributions to the ITER Organization for the U.S. share of common expenses such as personnel, infrastructure, assembly, and installation. The US-supplied hardware includes contributions in the areas of magnets, blankets, diagnostics, tritium processing, ion cyclotron and electron cyclotron heating and current drive systems, pellet fuelling, and more conventional systems such as cooling water and electrical power systems. The large scale of ITER (~24,000 tonnes of equipment in a ~30 m diameter cryostat), the significant extrapolation from previous fusion experiments (current record fusion power ~16 MW), and the need for long pulse, high reliability operation present many engineering challenges. This paper will describe the ITER design status and some of the challenges.
  • Keywords
    Tokamak devices; fusion reactors; Cadarache; Department of Energy Office of Science project; France; ITER; assembly; blankets; cash contribution; cooling water; current drive system; diagnostics; electrical power systems; electron cyclotron heating system; engineering challenges; experimental fusion device; hardware procurement; installation; international collaboration; ion cyclotron heating system; magnets; pellet fuelling; personnel assignment; power 400 MW; tritium processing; Cyclotrons; Design engineering; Hardware; International collaboration; Personnel; Power engineering and energy; Power system reliability; Procurement; Pulse power systems; Region 8;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Plasma Science, 2007. ICOPS 2007. IEEE 34th International Conference on
  • Conference_Location
    Albuquerque, NM
  • ISSN
    0730-9244
  • Print_ISBN
    978-1-4244-0915-0
  • Type

    conf

  • DOI
    10.1109/PPPS.2007.4345439
  • Filename
    4345439