Abstract :
Wind turbine generators (WTG) have been deployed in many places in the past. It is expected that more and more wind farms will be developed in the near future to meet the Renewable Portfolio Standards (RPS) target. This paper summarizes the experience of the California ISO (CAISO) with the wind generation interconnection studies. The power flow modeling of utility scale wind farm is summarized first. The challenges of dynamic modeling of large wind farm in generation interconnection and transmission planning studies are discussed. The impact of wind intermittency on the dynamic model of WTG is investigated. The wind generation interconnection studies in real system have been used as examples in the discussion.
Keywords :
power system interconnection; turbogenerators; wind power plants; wind turbines; CAISO; California ISO experience; RPS target; WTG; power flow modeling; renewable portfolio standard target; transmission planning study; wind farm modeling; wind generation interconnection study; wind turbine generator; Computational modeling; Generators; Load flow; Planning; Reactive power; Stability analysis; Wind farms; Dynamic; Generator interconnection; Intermittency; Modeling; Renewable Portfolio Standards; Renewable energy; Wind turbine generator;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2011 IEEE
Conference_Location :
San Diego, CA
ISSN :
1944-9925
Print_ISBN :
978-1-4577-1000-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2011.6038951
Filename :
6038951
Link To Document :
بازگشت