DocumentCode :
1616171
Title :
A practical equivalence method of large scale wind farm
Author :
Tuo, Xin ; Hong, Shen ; Hai, Baa ; Bin, Huang ; Dezhi, Chen ; Jian, Ding
Author_Institution :
Sch. of Electr. & Electron. Eng., North China Electr. Power Univ., Beijing, China
fYear :
2010
Firstpage :
1
Lastpage :
6
Abstract :
Large scale wind power integration is the main way of wind power development in China. In simulation research, a large scale wind farm is necessary equivalent to be one aggregated model. The existing equivalence methods only consider the external characteristics of wind farm, and ignored the coupling relationship between units and power system. Through a massive simulation at different wind power mode scheduling and unit´s operating point, this paper shows a wind farm operation condition, which its impacts on power system is severe. A practical equivalence method based on wind farm operation condition is proposed, and the effect of the method is validated by comparing the aggregated and detailed models.
Keywords :
scheduling; wind power plants; China; large scale wind power integration; practical equivalence method; wind farm; wind power development; wind power mode scheduling; Analytical models; Generators; equivalence method; large scale wind farm; transient stability; wind farm operating condition; wind power mode scheduling; wind turbine generator operating point;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power System Technology (POWERCON), 2010 International Conference on
Conference_Location :
Hangzhou
Print_ISBN :
978-1-4244-5938-4
Type :
conf
DOI :
10.1109/POWERCON.2010.5666663
Filename :
5666663
Link To Document :
بازگشت