• DocumentCode
    1616171
  • Title

    A practical equivalence method of large scale wind farm

  • Author

    Tuo, Xin ; Hong, Shen ; Hai, Baa ; Bin, Huang ; Dezhi, Chen ; Jian, Ding

  • Author_Institution
    Sch. of Electr. & Electron. Eng., North China Electr. Power Univ., Beijing, China
  • fYear
    2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Large scale wind power integration is the main way of wind power development in China. In simulation research, a large scale wind farm is necessary equivalent to be one aggregated model. The existing equivalence methods only consider the external characteristics of wind farm, and ignored the coupling relationship between units and power system. Through a massive simulation at different wind power mode scheduling and unit´s operating point, this paper shows a wind farm operation condition, which its impacts on power system is severe. A practical equivalence method based on wind farm operation condition is proposed, and the effect of the method is validated by comparing the aggregated and detailed models.
  • Keywords
    scheduling; wind power plants; China; large scale wind power integration; practical equivalence method; wind farm; wind power development; wind power mode scheduling; Analytical models; Generators; equivalence method; large scale wind farm; transient stability; wind farm operating condition; wind power mode scheduling; wind turbine generator operating point;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Technology (POWERCON), 2010 International Conference on
  • Conference_Location
    Hangzhou
  • Print_ISBN
    978-1-4244-5938-4
  • Type

    conf

  • DOI
    10.1109/POWERCON.2010.5666663
  • Filename
    5666663