• DocumentCode
    1616418
  • Title

    Study of the Scheduling Rules of Short-term Power Generation Dispatching for Single Hydropower Station

  • Author

    Chang-ming Ji ; Wei Xie ; Zi-jun Yang ; Xiao-xing Zhang ; Xin-liang Zhu

  • Author_Institution
    New & Renewable Energy of Beijing Key Lab., North China Electr. Power Univ., Beijing, China
  • fYear
    2012
  • Firstpage
    1412
  • Lastpage
    1416
  • Abstract
    Short-term optimal operation of hydropower station is a high-dimensional, multi-constraint and complex system problem. In this paper, Liyuan hydropower station located in the middle reaches of Jinsha River is cited as an example, and the mathematical model of optimal power generation dispatching has been established. We obtain a large amount of optimal scheduling processes by using the progressive optimality algorithm (POA). Then, the corresponding scheduling rules for single hydropower station which can take advantage of runoff prediction results are derived. A case indicates that the scheduling rules can be effectively used to guide the actual operation run of Liyuan hydropower station.
  • Keywords
    hydroelectric power stations; large-scale systems; power generation dispatch; power generation scheduling; Jinsha River; Liyuan hydropower station; POA; high-dimensional multiconstraint complex system; mathematical model; progressive optimality algorithm; runoff prediction; scheduling rules; short-term optimal operation; short-term optimal power generation dispatching; Floods; Hydroelectric power generation; Optimal scheduling; Reservoirs; Scheduling; Hydropower station; POA algorithm; scheduling rules; short-time power generation dispatching;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Control and Electronics Engineering (ICICEE), 2012 International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4673-1450-3
  • Type

    conf

  • DOI
    10.1109/ICICEE.2012.373
  • Filename
    6322662