DocumentCode
1617385
Title
Backup control center design and implementation criteria
Author
Savulescu, Savu C.
Author_Institution
Energy Consulting Int., Inc., New York, NY, USA
fYear
2011
Firstpage
1
Lastpage
6
Abstract
This presentation describes a "mirrored" two-control center architecture where each one of the two SCADA/EMS involved is able to operate in capacity of "primary system" without loss of data and functionality and with no impact on performance and other key attributes. The guiding principles and the conceptual overview of this architecture are addressed, and a number of key performance requirements are discussed. The approach presented herein can help utilities, consultants and system integrators design and implement utility information systems that can operate 24/7 without functional and performance degradation and virtually without loss of operational data.
Keywords
SCADA systems; energy management systems; SCADA-EMS; backup control center design; energy management systems; mirrored two-control center architecture; performance degradation; utility information systems; Control systems; Data models; Databases; Energy management; Information systems; Real time systems; Synthetic aperture sonar; SCADA/EMS; energy management systems; independent system operators; market systems; utility information systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2011 IEEE
Conference_Location
San Diego, CA
ISSN
1944-9925
Print_ISBN
978-1-4577-1000-1
Electronic_ISBN
1944-9925
Type
conf
DOI
10.1109/PES.2011.6039064
Filename
6039064
Link To Document