• DocumentCode
    1620240
  • Title

    A Quantitative Method on Choosing Equipment Procurement Project Organization Structure

  • Author

    Jun-feng, Sun ; Wo-ye, Liu

  • Author_Institution
    Six Dept., Shijiazhuang Mech. Eng. Coll., Shijiazhuang, China
  • fYear
    2012
  • Firstpage
    1935
  • Lastpage
    1937
  • Abstract
    Building institution of equipment procurement project management is an important goal of the equipment procurement institution revolutionary and choosing the right organizational structure is primary issue to achieve the goal. Based on the characteristics of the project, the paper builds the choosing model of equipment procurement project organization structure, and designs a quantitative method. Through the application example, the validity of the choosing method is proved.
  • Keywords
    design engineering; equipment selection; procurement; project management; equipment procurement institution revolutionary; equipment procurement project management institution; equipment procurement project organization structure choosing model; quantitative method; Indexes; Organizations; Procurement; Project management; Size measurement; Sorting; Vectors; Equipment procurement; Organizational structure; Project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Control and Electronics Engineering (ICICEE), 2012 International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4673-1450-3
  • Type

    conf

  • DOI
    10.1109/ICICEE.2012.514
  • Filename
    6322805