DocumentCode :
1620691
Title :
Replacement of the main 115 kV/13.8 kV substation at a large refinery — Justification, design, and implementation
Author :
Parvino, Troy ; Wood, Barry ; Ansley, Jacob
Author_Institution :
Chevron Global Manuf., Pascagoula, MS, USA
fYear :
2010
Firstpage :
1
Lastpage :
10
Abstract :
This paper discusses a large electrical infrastructure project which replaced two main 115 kV switchyards and main 13.8 kV substations at a large petroleum refinery over a period of seven years. It details the project from conceptual development through to construction, commissioning, and cutover of existing loads to the new substations. It highlights the successful efforts the project team took to win support of refinery management and the local electric utility in order to realize the team´s vision for a “world class substation”. The paper will also cover details of the cutover process which was executed safely, incident free, and without refinery plant shutdowns or slowdowns.
Keywords :
electricity supply industry; substations; electric utility; electrical infrastructure project; refinery management; substation; switchyard; voltage 115 kV; voltage 13.8 kV; Generators; Inductors; Power system reliability; Reliability; Substations; Switches; Switchgear; Reliability analysis; breaker-and-a-half; cutover; factory acceptance testing; power monitoring and management system; substation; substation commissioning; switchgear;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Petroleum and Chemical Industry Conference (PCIC), 2010 Record of Conference Papers Industry Applications Society 57th Annual
Conference_Location :
San Antonio, TX
ISSN :
0090-3507
Print_ISBN :
978-1-4244-6800-3
Type :
conf
DOI :
10.1109/PCIC.2010.5666838
Filename :
5666838
Link To Document :