Title :
Design of a priority-based load shed scheme and operation tests
Author :
Adamiak, Mark ; Schiefen, Michael ; Schauerman, Gary ; Cable, Bernard
Author_Institution :
GE Digital Energy, Wayne, PA, USA
Abstract :
Many large industrials operate internal co-generation systems to provide a substantial portion of their own power as well as to use the resulting output heat as part of their industrial process. Depending on the amount of co-generation, on loss of connection to the main grid or instability of the grid, these industrials may have the option of supplying all internal electrical loads from the co-generation or rather, shed a portion of the load in order to maintain plant stability. In order to maintain and maximize plant operations during either an islanded condition, a severe (and dropping) underfrequency condition, or a prolonged under voltage condition, a load shed scheme needs to dynamically monitor the load-generation unbalance in the plant and, upon detecting or determining any of the above conditions, needs to quickly initiate shedding of the optimal amount of load - based on a user-determined priority schedule. Examples of an actual load shed test are shown and analyzed.
Keywords :
cogeneration; electric power generation; facilities layout; industrial power systems; load distribution; load shedding; power grids; electrical load; industrial process; internal cogeneration system; load generation balancing; operation test; plant stability; priority-based load shed scheme; under voltage condition; underfrequency condition; Accuracy; Ethernet networks; Monitoring; Relays; Synchronization; Time frequency analysis; Turbines; GOOSE; IEC 61850; Load Priority; Load Shed;
Conference_Titel :
Petroleum and Chemical Industry Conference (PCIC), 2010 Record of Conference Papers Industry Applications Society 57th Annual
Conference_Location :
San Antonio, TX
Print_ISBN :
978-1-4244-6800-3
DOI :
10.1109/PCIC.2010.5666862