Title :
New Integrated Transmission Planning process in the Southwest Power Pool
Author_Institution :
Xcel Energy, Amarillo, TX, USA
Abstract :
This paper presents an overview of the Southwest Power Pool´s new Integrated Transmission Plan process, and how it lends itself to changing power system conditions, including evolving climate change technologies.
Keywords :
climate mitigation; power transmission planning; Southwest power pool; climate change technology; integrated transmission planning process; power system condition; Companies; Load modeling; Planning; Power markets; Robustness; Southwest Power Pool; Transmission Planning; Xcel Energy;
Conference_Titel :
Power and Energy Society General Meeting, 2011 IEEE
Conference_Location :
San Diego, CA
Print_ISBN :
978-1-4577-1000-1
Electronic_ISBN :
1944-9925
DOI :
10.1109/PES.2011.6039403