Estimation in agile environment using resistance factors
Author
Popli, Rashmi ; Chauhan, Naresh
Author_Institution
Comput. Eng. Dept., YMCA Univ. of Sci. & Technol., Faridabad, India
fYear
2014
fDate
1-2 March 2014
Firstpage
60
Lastpage
65
Abstract
The estimation of cost and effort is a critical task in Agile environment because of its dynamic nature. It has been observed that the current Agile methods mostly depends on historical data of project for estimation of cost, size, effort and duration and these methods are not efficient in absence of historical data. So there is need of an algorithmic method, which can calculate cost and effort of the project. In our previous work [2] some project-related factors and people-related factors were considered on the basis of which size as well as duration of the project was calculated. However, several other resistance factors may also affects estimation in the Agile dynamic environment. In this work an Algorithmic estimation method is being proposed that calculates more accurate release date, cost, effort and duration for the project by considering various factors. The effectiveness and feasibility of the proposed algorithm has been shown by considering two cases in which different levels of factors are taken and compared.
Keywords
software cost estimation; software prototyping; agile dynamic environment; algorithmic estimation method; cost estimation; resistance factors; Agile software development; Availability; Complexity theory; Estimation; Heuristic algorithms; Resistance; Software; Agile estimation methods; Story Point; Traditional estimation model; User-stories; cost; effort; size;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Systems and Computer Networks (ISCON), 2014 International Conference on
Conference_Location
Mathura
Print_ISBN
978-1-4799-2980-1
Type
conf
DOI
10.1109/ICISCON.2014.6965219
Filename
6965219
Link To Document