DocumentCode :
1634544
Title :
Methodologies for testing a 2 MW permanent magnet wind turbine generator
Author :
Karmaker, Haran ; Knierim, Glenn A. ; Ho, Mantak ; Palle, Bhaskara
Author_Institution :
Global R&D Center, TECO-Westinghouse Motor Co., Round Rock, TX, USA
fYear :
2011
Firstpage :
1
Lastpage :
5
Abstract :
No known guide exists for testing commercial multi-megawatt size permanent magnet (PM) wind turbine generators. Recently, a project has been approved by IEEE to develop a trial use of a guide for testing PM machines. The first author of this paper is the Chair of the working group volunteering to develop this guide. The working group has started working on the guide and plans to present its work in future. The authors of this paper would like to share their experience on testing a 2 MW wind turbine generator with a PM rotor.
Keywords :
permanent magnet generators; rotors; testing; turbogenerators; wind turbines; PM rotor; permanent magnet wind turbine generator; power 2 MW; Generators; IEC standards; Loss measurement; Rotors; Synchronous motors; Testing; Wind turbines; Permanent Magnet; Testing; Wind Generator;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2011 IEEE
Conference_Location :
San Diego, CA
ISSN :
1944-9925
Print_ISBN :
978-1-4577-1000-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2011.6039715
Filename :
6039715
Link To Document :
بازگشت