DocumentCode
1636150
Title
Cost Optimization Model for Linear Scheduling Problems Considering Work Continuity
Author
Liu, Shu-Shun ; Wang, Chang-Jung
Author_Institution
Dept. of Constr. Eng., Nat. Yunlin Univ. of Sci. & Technol., Touliu
fYear
2008
Firstpage
5505
Lastpage
5509
Abstract
For linear construction projects, it has long been known that work continuity is important in improving efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This paper presents an optimization model for solving linear scheduling problems involving maintaining work continuity. The proposed model adopts constraint programming (CP) as the searching algorithm, aiming at optimizing project total cost. Through cast study, the efficiency of the proposed model is then illustrated.
Keywords
constraint handling; construction industry; costing; optimisation; scheduling; search problems; constraint programming; cost optimization model; linear construction projects; linear scheduling problems; searching algorithm; work continuity; Communications Society; Constraint optimization; Cost function; Dynamic programming; Genetic algorithms; Linear programming; Mathematical model; Mathematical programming; Neural networks; Processor scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Communications, 2008. ICC '08. IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-2075-9
Electronic_ISBN
978-1-4244-2075-9
Type
conf
DOI
10.1109/ICC.2008.1032
Filename
4534068
Link To Document