Title :
Evaluation of GENCO´s strategy in creating a congested system for exercising market power
Author :
Nappu, M.B. ; Bansal, R.C.
Author_Institution :
Sch. of Inf. Technol. & Electr. Eng., Univ. of Queensland, St. Lucia, QLD, Australia
Abstract :
An independent system operator must be able to simulate market performance and to identify participants which have potential points to exercise market power with the purpose of guarantee a safe, transparent and fair competition among market participants. This manuscript recognises the impact of bidding strategy taken by prospective generation company within the potential region to be congested. In this paper a composite method for investigating market power under congestion condition is proposed, which employs shift-factor optimal power flow based LMP-lossless scheme. A 24-bus IEEE Reliability Test system (IEEE-RTS) is employed as the case study to investigate some financial implications of market power under congestion circumstances.
Keywords :
load flow; power markets; GENCO strategy evaluation; IEEE reliability test system; LMP-lossless scheme; bidding strategy; independent system operator; market power; shift-factor optimal power flow; Electricity supply industry; Generators; Indexes; Load flow; Monopoly; Production; Reliability; bidding strategy; competitive electricity market; locational marginal prices; marginal cost; market power; market share; optimal power flow; transmission congestion;
Conference_Titel :
Power and Energy Society General Meeting, 2011 IEEE
Conference_Location :
San Diego, CA
Print_ISBN :
978-1-4577-1000-1
Electronic_ISBN :
1944-9925
DOI :
10.1109/PES.2011.6039867