DocumentCode :
1641658
Title :
Notice of Retraction
A study on the influencing factors and control of project quality
Author :
Yang, Huanchun
Author_Institution :
School of Business Wenzhou University Wenzhou, China
fYear :
2011
Firstpage :
1
Lastpage :
4
Abstract :
Notice of Retraction

After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE\´s Publication Principles.

We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

By analyzing the five factors that affect the project quality, i.e. “engineers, construction materials, construction equipment, construction methods and construction environment", this paper narrates three control processes of the project quality, that is, pre-event control, amid-event control and post-event control, then puts forward control methods of the project quality, and finally proposes quality control principles of projects.
Keywords :
Inspection; Materials; Organizations; Process control; Quality control; Standards organizations; control methods; control principles; control processes; influencing factors; project quality;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
E -Business and E -Government (ICEE), 2011 International Conference on
Conference_Location :
Shanghai, China
Print_ISBN :
978-1-4244-8691-5
Type :
conf
DOI :
10.1109/ICEBEG.2011.5881919
Filename :
5881919
Link To Document :
بازگشت