DocumentCode :
1643731
Title :
California Independent System Operator demand response & proxy demand resources
Author :
Goodin, John
Author_Institution :
Demand Response, Market Design & Regul. Policy, California ISO, Folsom, CA, USA
fYear :
2012
Firstpage :
1
Lastpage :
3
Abstract :
Demand response programs are designed to allow end use customers to contribute to energy load reduction individually or through a demand response provider. The CAISO is charged with ensuring the safe and reliable transportation of electricity on the high voltage transmission system while ensuring diverse resources have equal access to the system and markets. Pricing for proxy demand resource in the wholesale market is based on the day-ahead or real-time market locational marginal price, whichever market is applicable to the proxy demand resource´s awarded bid.
Keywords :
power markets; power transmission economics; pricing; resource allocation; California independent system operator demand response; demand response provider; electricity transportation safety; end use customers; energy load reduction; high voltage transmission system; proxy demand resources pricing; real-time market locational marginal price; Awards activities; Business; Electricity; ISO; Load management; Real time systems; Telemetry;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Innovative Smart Grid Technologies (ISGT), 2012 IEEE PES
Conference_Location :
Washington, DC
Print_ISBN :
978-1-4577-2158-8
Type :
conf
DOI :
10.1109/ISGT.2012.6175734
Filename :
6175734
Link To Document :
بازگشت