• DocumentCode
    1643867
  • Title

    Scheduling parallel multiple capacitated machines with sequence-dependent constraint

  • Author

    Yanyan, Zhao ; Tieke, Li ; Bailin, Wang

  • Author_Institution
    School of Economics and Management, University of Science and Technology Beijing Beijing, China
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper introduces a new kind of parallel machines scheduling problem. Each job has a minimal processing time and all the machines are multiple capacitated machines in this problem. Each machine can process at most β jobs simultaneously according to the First-In-First-Out discipline, and the completion sequence and completion time interval between two jobs are restricted by the plan. A CSP model and a heuristic algorithm are put forward. The algorithm contains two stages, in the first stage, a method of job assignment based on expected starting time is presented; and in the second stage, the timetable is output to minimize the objective function. Computational tests reflect that both the model and the heuristic are feasible and efficient.
  • Keywords
    Algorithm design and analysis; Computational modeling; Furnaces; Job shop scheduling; Optimal scheduling; Processor scheduling; Slabs; Heuristic; Parallel multiple machines; Scheduling; Sequence-dependent;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E -Business and E -Government (ICEE), 2011 International Conference on
  • Conference_Location
    Shanghai, China
  • Print_ISBN
    978-1-4244-8691-5
  • Type

    conf

  • DOI
    10.1109/ICEBEG.2011.5882009
  • Filename
    5882009