DocumentCode
1643867
Title
Scheduling parallel multiple capacitated machines with sequence-dependent constraint
Author
Yanyan, Zhao ; Tieke, Li ; Bailin, Wang
Author_Institution
School of Economics and Management, University of Science and Technology Beijing Beijing, China
fYear
2011
Firstpage
1
Lastpage
4
Abstract
This paper introduces a new kind of parallel machines scheduling problem. Each job has a minimal processing time and all the machines are multiple capacitated machines in this problem. Each machine can process at most β jobs simultaneously according to the First-In-First-Out discipline, and the completion sequence and completion time interval between two jobs are restricted by the plan. A CSP model and a heuristic algorithm are put forward. The algorithm contains two stages, in the first stage, a method of job assignment based on expected starting time is presented; and in the second stage, the timetable is output to minimize the objective function. Computational tests reflect that both the model and the heuristic are feasible and efficient.
Keywords
Algorithm design and analysis; Computational modeling; Furnaces; Job shop scheduling; Optimal scheduling; Processor scheduling; Slabs; Heuristic; Parallel multiple machines; Scheduling; Sequence-dependent;
fLanguage
English
Publisher
ieee
Conference_Titel
E -Business and E -Government (ICEE), 2011 International Conference on
Conference_Location
Shanghai, China
Print_ISBN
978-1-4244-8691-5
Type
conf
DOI
10.1109/ICEBEG.2011.5882009
Filename
5882009
Link To Document