Abstract :
Modern power system instrumentation systems require relatively sophisticated test equipment for commissioning, testing and fault finding purposes. Here, the author describes how power system test equipment, ranging from simple manual test sets to fully-computerised test equipment is available now and is likely to be used increasingly in the future as the complexity of electronic metering, protection and control equipment installed on electricity networks continues to increase