    A new approach for predicting project duration using beta shape membership functions and simulation

  • Author

    Khanmohammadi, S. ; Jassbi, J.

  • Author_Institution
    Dept. of Ind. Manage., Islamic Azad Univ., Tehran, Iran
  • fYear
    2010
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In this paper a new approach for predicting the project duration is introduced. Fuzzy values with beta shape memberships are used - Instead of using the pessimistic, most likely and optimistic values - for estimating the durations of activities. Also the possibility of performing any activity in estimated duration is taken to account by using beta shape memberships for a reliable estimating of activity duration. The delay times of activities caused by environment are also considered. The Mont Carlo simulation is used for comparing the results obtained by the introduced method and the classic PERT.
  • Keywords
    Monte Carlo methods; PERT; critical path analysis; fuzzy set theory; project management; Monte Carlo simulation; PERT; activity duration estimation; beta shape membership function; critical path method; delay time; fuzzy value; optimistic value; program evaluation and review technique; project duration; Delay; Finishing; Fuzzy logic; Fuzzy sets; Probability; Project management; Shape; Beta shape membership; Critical Path; Fuzzy Possibility; delay time;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computers and Industrial Engineering (CIE), 2010 40th International Conference on
  • Conference_Location
    Awaji
  • Print_ISBN
    978-1-4244-7295-6
  • Type

    conf

  • DOI
    10.1109/ICCIE.2010.5668164
  • Filename
    5668164