• DocumentCode
    1649925
  • Title

    Implementing requirements for upgrading emergency operating procedures: a regulatory perspective

  • Author

    Bongarra, James P., Jr. ; Persensky, Julius J.

  • Author_Institution
    US Nucl. Regulatory Comm., Washington, DC, USA
  • fYear
    1988
  • Firstpage
    208
  • Lastpage
    213
  • Abstract
    Requirements for the commercial nuclear power industry to improve the quality and useability of plant procedures, including emergency operating procedures (EOPs), were established as a result of the accident at Three Mile Island. The authors review the historical background of the requirements for upgrading EOPs and the industry´s efforts to meet these requirements, assess the success of the PGP (procedures generation packages) concept as a technique for ensuring that quality EOPs are developed and implemented by the industry, and discuss the program for inspecting EOPs.<>
  • Keywords
    maintenance engineering; nuclear power stations; emergency operating procedures upgrading; nuclear power industry; procedures generation packages; regulatory perspective; Fission reactors; Guidelines; Industrial accidents; Job shop scheduling; Monitoring; Nuclear facility regulation; Performance analysis; Power generation; Power industry; Transient analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Human Factors and Power Plants, 1988., Conference Record for 1988 IEEE Fourth Conference on
  • Conference_Location
    Monterey, CA, USA
  • Type

    conf

  • DOI
    10.1109/HFPP.1988.27504
  • Filename
    27504