Title :
A new scheduling system with assumption-based inference
Author :
Mishima, Y. ; Ogai, H. ; Ishizaki, K. ; Shinkura, K.
Author_Institution :
Nippon Steel Corp., Chiba, Japan
Abstract :
An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that makes it possible to search state space effectively by the pair coils exchange method, and to avoid combinational explosion, was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality
Keywords :
inference mechanisms; knowledge based systems; production control; scheduling; search problems; state-space methods; steel manufacture; assumption-based inference; pair coils exchange method; scheduling system; state-space searching; steel-making; Annealing; Coils; Equations; Production systems; Prototypes; Rubber; Scheduling; State-space methods; Steel; Temperature;
Conference_Titel :
Industrial Electronics Society, 1990. IECON '90., 16th Annual Conference of IEEE
Conference_Location :
Pacific Grove, CA
Print_ISBN :
0-87942-600-4
DOI :
10.1109/IECON.1990.149325