DocumentCode
1656666
Title
A solution of human resource allocation problem in a case of hotel management
Author
Murakami, Kayoko ; Tasan, Seren Ozmehmet ; Gen, Mitsuo ; Oyabu, Takashi
Author_Institution
Sch. of Arts & Sci., Shibaura Inst. of Technol., Saitama, Japan
fYear
2010
Firstpage
1
Lastpage
6
Abstract
The purpose of this study is to optimally allocate the human resources to tasks while minimizing the total daily human resource costs and smoothing the human resource usage. This human resource allocation problem (hRAP) has two kinds of special constraints, i.e. operational precedence and skill constraints in addition to the ordinary constraints. To deal with the multiple objectives and the special constraints, first we designed this hRAP as a network problem and then proposed a Pareto multistage decision-based genetic algorithm (P-mdGA) to solve it. During the evolutionary process of P-mdGA, a Pareto evaluation procedure called generalized Pareto-based scale-independent fitness function approach was used to evaluate the solutions. Additionally, in order to improve the performance of P-mdGA, we used fuzzy logic controller for fine-tuning genetic parameters. Finally, in order to demonstrate the applicability and to evaluate the performance of the proposed approach, P-mdGA was applied to solve a case study in a hotel, where the managers usually need helpful automatic support for effectively allocating hotel staff to hotel tasks.
Keywords
Pareto optimisation; decision making; fuzzy control; genetic algorithms; hotel industry; human resource management; resource allocation; Pareto based scale independent fitness function approach; Pareto multistage decision; evolutionary process; fine tuning genetic parameter; fuzzy logic controller; genetic algorithm; hRAP; hotel management; human resource allocation; human resource usage; network problem; operational precedence; special constraint; Biological cells; Encoding; Genetics; Humans; Resource management; Schedules; Smoothing methods; Pareto evaluation; genetic algorithm; human resource; operational precedence constraint; resource allocation; skill; smoothing resource usage;
fLanguage
English
Publisher
ieee
Conference_Titel
Computers and Industrial Engineering (CIE), 2010 40th International Conference on
Conference_Location
Awaji
Print_ISBN
978-1-4244-7295-6
Type
conf
DOI
10.1109/ICCIE.2010.5668447
Filename
5668447
Link To Document