Application of dynamic CPM optimal algorithm based on constraints in construction progress
Author
Li, Mingshun ; Chen, Wencui
Author_Institution
Department of Project Management Changsha University of Science & Technology Changsha China
fYear
2011
Firstpage
1
Lastpage
4
Abstract
On the basis of traditional CPM, considering the effect of time constraints and process constraints, this paper studies the dynamic adjustment method of network time parameter, simulates the uncertainty of project task duration through applying Monte Carlo techniques. Then establishes a model of dynamic CPM optimal algorithm based on constraints and takes the calculation of project examples. The algorithm accesses not only the critical path and its statistical properties, but also the interval duration, minor critical path and the conflicts that may occur, providing more decision-making information for construction schedule for project management.
Keywords
Heuristic algorithms; Optimization; Project management; Radio frequency; Schedules; Time factors; CPM algorithm; constraints; construction schedule management; dynamic optimization;
fLanguage
English
Publisher
ieee
Conference_Titel
E -Business and E -Government (ICEE), 2011 International Conference on
Conference_Location
Shanghai, China
Print_ISBN
978-1-4244-8691-5
Type
conf
DOI
10.1109/ICEBEG.2011.5882545
Filename
5882545
Link To Document