• DocumentCode
    1657911
  • Title

    Notice of Retraction
    Debt investment risks control of logistics park based on the option contract

  • Author

    Liu, Junhua ; Li, Wenjie ; Chang, Qing ; Li, Changqing

  • Author_Institution
    School of Management, Inner Mongolia University of Technology, Huhot, China
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    Investing to logistics park is a long payback period, many uncertainty and risks. Two-stage investment using of option contracts could reduce some investment risks. In the second investment stage, two methods are taken, i.e. mathematical logic judgment based on the past operation in the park and probability estimates considering the future operations according to the experts´ probability estimates. So the problem of whether and how much to invest is resolved. At last, a numerical example is presented.
  • Keywords
    Contracts; Data envelopment analysis; Educational institutions; Investments; Logistics; Transportation; Venture capital; logistics park; option contract; probability estimates inser; risk control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E -Business and E -Government (ICEE), 2011 International Conference on
  • Conference_Location
    Shanghai, China
  • Print_ISBN
    978-1-4244-8691-5
  • Type

    conf

  • DOI
    10.1109/ICEBEG.2011.5882568
  • Filename
    5882568