• DocumentCode
    1659130
  • Title

    Stochastic multiple objective electric Generation Expansion Planning

  • Author

    Coit, David W. ; Selcuklu, Saltuk ; Chatwattanasiri, Nida ; Wattanapongsakorn, Naruemon

  • Author_Institution
    Dept. of Ind. & Syst. Eng., State Univ. of New Jersey, Piscataway, NJ, USA
  • fYear
    2015
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The Generation Expansion Planning (GEP) problem applies to the expansion of the electricity generation network with new power plant investments. It is a multi-objective optimization problem where the level of uncertainty is very high because of its spatial dimensions and time scale. Therefore, it becomes necessary to introduce in the decision making process a systematic treatment of uncertainty to select the set of non-dominated solutions for the Pareto optimal set. In this paper, we will investigate probabilistic Pareto optimality where the probability that one expectedly non-dominated solution dominates another expectedly non-dominated solution in the Pareto optimal set is calculated.
  • Keywords
    Pareto optimisation; decision making; power generation planning; probability; stochastic processes; stochastic programming; GEP; Pareto optimal set; decision making process; generation electricity network expansion; multiobjective optimization problem; probability; stochastic multiple objective electric generation expansion planning; Linear programming; Mathematical model; Planning; Probabilistic logic; Production; Stochastic processes; Uncertainty; Generation Expansion Planning (GEP); Probabilistic Pareto Optimality; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), 2015 12th International Conference on
  • Conference_Location
    Hua Hin
  • Type

    conf

  • DOI
    10.1109/ECTICon.2015.7206942
  • Filename
    7206942