• DocumentCode
    1670016
  • Title

    Two views of fiber-in-the-loop deployment

  • Author

    Eiger, Martin I. ; Hisiger, Robert S. ; Martija, Ricardo V. ; Lemberg, Howard L.

  • Author_Institution
    Bellcore, Morristown, NJ, USA
  • fYear
    1993
  • Abstract
    The economics of new-build and rehabilitation deployment of fiber and copper loops from both microscopic and macroscopic perspectives are studied. Both models incorporate installed first costs (IFCs) and operations, administration, maintenance, and provisioning (OAM&P) expenses and use learning curves and inflation to trend costs. The microscopic model evaluates the economics of rehabilitation in a relatively small area, assuming fixed overall loop deployment schedules that drive cumulative production volumes and learning-curve-based costs. The macroscopic perspective, in contrast, models widespread deployment, taking into account the fact that near-term deployment decisions in many places will impact the costs of alternatives in the future
  • Keywords
    optical fibre subscriber loops; OAM&P expenses; administration; copper loops; economics; fiber-in-the-loop; inflation; installed first costs; learning-curve-based costs; macroscopic perspective; maintenance; microscopic model; new-build deployment; operations; provisioning; rehabilitation deployment; Copper; Costs; Microscopy; Optical devices; Optical fiber subscriber loops; Optical fibers; Production systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Optical/Hybrid Access Networks, 1993., 5th Conference on
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    0-7803-1249-X
  • Type

    conf

  • DOI
    10.1109/OHAN.1993.588651
  • Filename
    588651