• DocumentCode
    1672974
  • Title

    A Polynomial Algorithm for No-Wait Cyclic Multi-Hoist Scheduling

  • Author

    Chet, Ada ; Chu, Chengbin

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xi´´an
  • Volume
    2
  • fYear
    2006
  • Firstpage
    1156
  • Lastpage
    1161
  • Abstract
    This paper addresses cyclic scheduling of multiple hoists in a no-wait electroplating line with constant processing times. The objective is to minimize the cycle time, or equivalently maximizing the production throughput, for a given number of hoists. The problem is first formulated as a set of prohibited intervals for the cycle time. We then prove that the optimal cycle time is necessarily one of special values of the cycle time, and thus reduce the problem to a feasibility-checking problem for a given value of the cycle time. We show that the latter problem can be transformed to a longest path problem in a directed graph. The complete algorithm is shown to be polynomial in the number of tanks in an electroplating line
  • Keywords
    electroplating; hoists; polynomials; scheduling; tanks (containers); constant processing time; feasibility-checking problem; multiple hoists; no-wait cyclic scheduling; no-wait electroplating line; optimal cycle time; polynomial algorithm; production throughput; tanks; Chemicals; Materials handling; Polynomials; Production systems; Scheduling algorithm; Technology management; Throughput; Time measurement; Hoist scheduling problem; electroplating lines; multiple hoists; polynomial algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Systems and Service Management, 2006 International Conference on
  • Conference_Location
    Troyes
  • Print_ISBN
    1-4244-0450-9
  • Electronic_ISBN
    1-4244-0451-7
  • Type

    conf

  • DOI
    10.1109/ICSSSM.2006.320671
  • Filename
    4114653