A Polynomial Algorithm for No-Wait Cyclic Multi-Hoist Scheduling
Author :
Chet, Ada ; Chu, Chengbin
Author_Institution :
Sch. of Manage., Northwestern Polytech. Univ., Xi´´an
Volume :
2
fYear :
2006
Firstpage :
1156
Lastpage :
1161
Abstract :
This paper addresses cyclic scheduling of multiple hoists in a no-wait electroplating line with constant processing times. The objective is to minimize the cycle time, or equivalently maximizing the production throughput, for a given number of hoists. The problem is first formulated as a set of prohibited intervals for the cycle time. We then prove that the optimal cycle time is necessarily one of special values of the cycle time, and thus reduce the problem to a feasibility-checking problem for a given value of the cycle time. We show that the latter problem can be transformed to a longest path problem in a directed graph. The complete algorithm is shown to be polynomial in the number of tanks in an electroplating line
Keywords :
electroplating; hoists; polynomials; scheduling; tanks (containers); constant processing time; feasibility-checking problem; multiple hoists; no-wait cyclic scheduling; no-wait electroplating line; optimal cycle time; polynomial algorithm; production throughput; tanks; Chemicals; Materials handling; Polynomials; Production systems; Scheduling algorithm; Technology management; Throughput; Time measurement; Hoist scheduling problem; electroplating lines; multiple hoists; polynomial algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Service Systems and Service Management, 2006 International Conference on
Conference_Location :
Troyes
Print_ISBN :
1-4244-0450-9
Electronic_ISBN :
1-4244-0451-7
Type :
conf
DOI :
10.1109/ICSSSM.2006.320671
Filename :
4114653
Link To Document :
بازگشت