    Design of integrated cost and contract management information systems for mega project

  • Author

    Luo, Sheng ; Lu, Yujie ; Le, Yun ; Peng, Yong

  • Author_Institution
    School of Economics and Management Tongji University Shanghai, China
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This research designs a concept of integrated cost control, contract management and information collaboration in the Project Management Information System (PMIS), based on the EXPO 2010 Shanghai construction project. In our model, the “Basic Unit of Public Information (BUPI)” and “Contract Control Unit (CCU)” are originally discussed to create the relationship between the cost control and the contract management, and to meet various demands from project managers and owners in mega projects. A static framework in the context of web-based project information platform is introduced later to examine this concept, where different information of project level, contract level, and CCU level can be shared and integrated effectively. This research initially bridges the gaps between the cost control and contract management especially for mega project in the construction industry, and the result can be applied in both academic and practical fields.
  • Keywords
    Contracts; Control systems; Electric breakdown; Information systems; Project management; Schedules; Unified modeling language; contract management; cost control; mega project; project management information system (PMIS);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E -Business and E -Government (ICEE), 2011 International Conference on
  • Conference_Location
    Shanghai, China
  • Print_ISBN
    978-1-4244-8691-5
  • Type

    conf

  • DOI
    10.1109/ICEBEG.2011.5887067
  • Filename
    5887067