DocumentCode :
1679068
Title :
Some problems of the partial opening of the electricity market
Author :
Benko, I.
Author_Institution :
Budapest, Hungary
fYear :
1999
Firstpage :
12
Abstract :
The opening of the electricity market requires changes in the structure and operation of the power system. This paper deals with the possible minimization of the costs occurring at the partial opening of the market and the relationship of the electricity cost and availability of supply for customers connected to different network sources.
Keywords :
electricity supply industry; power system economics; costs minimization; electricity cost; electricity market; partial opening; power system operation; power system structure; supply availability; Availability; Control systems; Cost function; Dispatching; Electricity supply industry; Energy management; Investments; Power markets; Power system control; Power systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Power Engineering, 1999. PowerTech Budapest 99. International Conference on
Conference_Location :
Budapest, Hungary
Print_ISBN :
0-7803-5836-8
Type :
conf
DOI :
10.1109/PTC.1999.826443
Filename :
826443
Link To Document :
بازگشت