DocumentCode :
1681455
Title :
Influence of load behavior on service restoration
Author :
Babnik, T. ; Gasperic, S. ; Gubina, A. ; Gubina, F.
Author_Institution :
Fac. of Electr. Eng., Ljubljana Univ., Slovenia
fYear :
1999
Firstpage :
116
Abstract :
An extended fault in a distribution system may pose problems during feeder restoration. Immediately after energizing the feeder, high currents may arise due to a phenomenon called cold load pick-up (CLPU), causing activation of the overcurrent protection and preventing immediate reconnection of all load. The feeder should be sectioned and the restoration performed in steps. In the paper, an algorithm for determination of a sequence of restoration actions is presented. The algorithm determines the maximum number of customers that can be reconnected immediately and recommends time delays to restore the remaining sections with regards to the setting of overcurrent protection. The results of a restoration simulation on a part of the Slovenian distribution system are presented in the paper.
Keywords :
load (electric); overcurrent protection; power distribution faults; power distribution protection; power system restoration; Slovenian distribution system; cold load pick-up; distribution system; extended fault; feeder energisation; feeder restoration; feeder sectioning; high currents; immediate load reconnection prevention; load behavior; overcurrent protection activation; service restoration; ste-by-step restoration; time delays; Automatic control; Delay effects; Load modeling; Protection; Steady-state; Student members; Testing; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Power Engineering, 1999. PowerTech Budapest 99. International Conference on
Conference_Location :
Budapest, Hungary
Print_ISBN :
0-7803-5836-8
Type :
conf
DOI :
10.1109/PTC.1999.826547
Filename :
826547
Link To Document :
بازگشت