Title : 
The levelized reserve capacity method for the maintenance scheduling of the generating units
         
        
            Author : 
Kurban, M. ; Tarkan, N.
         
        
            Author_Institution : 
Turkey
         
        
        
        
            Abstract : 
In this paper, the computational procedures for generating unit maintenance scheduling using the levelized reserve capacity method are given by using an example system. The rates obtained are used to estimate the power plant´s capacity factors. The influence of the generating unit´s maintenance is taken into account in the obtained energy output of each generating unit, production cost and the power system´s reliability.
         
        
            Keywords : 
maintenance engineering; power generation planning; power stations; scheduling; capacity factors; energy output; generating units; levelized reserve capacity method; maintenance scheduling; power system reliability; production cost; Character generation; Cost function; Maintenance; Optimal scheduling; Power generation; Power generation economics; Power system economics; Power system reliability; Processor scheduling; Production;
         
        
        
        
            Conference_Titel : 
Electric Power Engineering, 1999. PowerTech Budapest 99. International Conference on
         
        
            Conference_Location : 
Budapest, Hungary
         
        
            Print_ISBN : 
0-7803-5836-8
         
        
        
            DOI : 
10.1109/PTC.1999.826696