• DocumentCode
    1693490
  • Title

    Transient multiple hoist scheduling of consecutive cyclic schedules

  • Author

    Fröhlich, Ralf ; Steneberg, Steffen C.

  • Author_Institution
    Inst. of Autom., Hamburg Univ. of Technol., Hamburg, Germany
  • fYear
    2011
  • Firstpage
    357
  • Lastpage
    362
  • Abstract
    This paper addresses the transient multi-hoist scheduling problem in flexible manufacturing facilities and focuses on the Lot Switching procedure. The problem arises in automated electroplating lines where multiple hoists are operating on a shared track and due to a flexible production different product types needs to be manufactured which differ in the routing through the facility. The considered processing sequences may contain loops, i.e. multiple usages of single machines within a sequence. In addition the electroplating line may be equipped with identical machines used as parallel resources. A mixed integer linear programming (MILP) model for optimizing the Lot Switching schedule is presented considering in particular collisions of hoists. A real world example indicating that the model finds schedules for the transition in reasonable time is presented.
  • Keywords
    dynamic scheduling; flexible manufacturing systems; integer programming; linear programming; single machine scheduling; MILP; automated electroplating lines; consecutive cyclic schedules; lot switching procedure; manufacturing facilities; mixed integer linear programming; single machines; transient multiple hoist scheduling; Finishing; Loading; Optimal scheduling; Production; Schedules; Switches; Transient analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2011 IEEE Conference on
  • Conference_Location
    Trieste
  • ISSN
    2161-8070
  • Print_ISBN
    978-1-4577-1730-7
  • Electronic_ISBN
    2161-8070
  • Type

    conf

  • DOI
    10.1109/CASE.2011.6042420
  • Filename
    6042420